Our estimating team has multiple years of experience with reading design drawings and using technology to provide well-executed takeoffs. We can efficiently tabulate and deliver takeoffs on time.

Construction Estimating

We use client provided project drawings to produce Quantity Takeoffs for their use in submitting construction bids. By outsourcing the quantity takeoff portion of work, clients can increase the number of bids submitted – a winning strategy in these competitive times. Imagine being able to submit 10+ bids using the same cost and time as submitting 1 bid.

Our quantity takeoff services involve measuring, counting and figuring quantities of select construction items contained within the design drawings. Our takeoffs are reviewed by seasoned architects and customized to meet each individual client’s needs. These takeoffs are typically used for bidding. budgeting or ordering purposes.

Pricing

  • Overview Discussion of Plans | 1 hour
  • Additional Assistance | $80.00 Hourly Rate
  • 1·3 Hours | Up to $300
  • 4-7 Hours | Up to $500
  • 8·10 Hours | Up to $850
  • Subscriptions Available

Your Affordable Quantity Takeoff Solution for Small to Medium Contractors

Type of Projects

  • Civil work
  • New Building Construction
  • Building Renovation Work
  • Commercial – Office, Retail, Warehouse
  • Industrial
  • Recreational – Parks

Services Offered

  • Takeoff for Construction Projects
  • Takeoff for Material Suppliers for Preparing Material Supply Bid/ Proposal
  • We Use Electronic Construction Takeoff Software
  • Reduce Your Estimating Dept Overhead Costs
  • Save Time and Money in Bidding and Be More competitive
  • Files Are Exportable to Excel
  • We Provide Colored Markups for Your Review of Takeoff and Verifying Quantities

Quantity Takeoffs for

Division 3· Concrete

  • Cubic. yards of concrete to be poured (only when sufficient information is provided on drawings to determine slab depth and any other relevant measurement information)
  • Exterior masonry cladding (brick. stone, CMU, etc.)
  • Bollards

Division 5: Metals

  • Metal decking
  • Metal Railing

Division 6: Wood, Plastic, Composites

  • Wood sub-flooring
  • Wood paneling
  • Wood trim

Division 8: Openings

  • Doors
  • Frames
  • Windows

Division 9 Finishes

  • All finishes (paint, carpet. wallpaper, flooring (all types), etc.)
  • Gypsum board (walls and ceilings)
  • ACT (acoustical ceiling tile)
  • Wall base, all types

Division 32: Exterior Improvements

  • Fences and gates

Flat Rate Pricing I Possible Methods

Our Quoted pricing is dependent on project-specific parameters and the estimated workload for completion.

  • By 1,000 SF increments per project size
  • By project type (to account tor typical number of individual elements due to scope complexity)
  • By divisions – some require more time than others to calculate