All Subcontractor Packages
Division 23 — HVAC & MechanicalOpen for Review

56 Cooper Lake — HVAC Subcontractor Review Package (BIM R67)

56 Cooper Lake Road — Three-Story Luxury Residence · Mableton, GA 30126

Model / Drawing RevisionBasis: BIM Revision R67 · IFC4 Schema (78 HVAC Objects)
Review / Bid Due Date2026-11-15
Interactive 3D WebGL BIM Viewer · 56_Cooper_Lake_HVAC_R67.ifc

56 Cooper Lake — 3D HVAC Coordination Model (78 IFC4 Objects)

Zone Views:
Showing 78 of 78 IFC4 HVAC Objects
Drag to orbit · Scroll to zoom · Shift+Drag to pan · Click any 3D object to inspect
━ Solid Cyan: Sketch-Traced┅ Dashed + □: Route Study▣ Yellow Trim: R67 Priority
AH-M-1AH-M-1 · 5-Ton Main Level Air Handler (Relocated R67)IFC4 GUID: 2O2Fr$t4X7Zf8EQ01_9e3779 · Class: IfcUnitaryEquipment · Source: Documents/IMG_4516.jpeg
R67 Priority Item
Selected Object: AH-M-1Equipment

AH-M-1 · 5-Ton Main Level Air Handler (Relocated R67)

5.0 Ton · 2000 CFM · Vertical Upflow to Main Trunk · Verify closet door & service clearance

Moved by owner direction to basement storage closet immediately left of lower utility room
Contractor Source Sketch Review Selector (5 Embedded Sheets)

Verify IFC4 Geometry Against Contractor Source Sketches (IMG_4512 – IMG_4516)

All 5 Contractor Original Photos Embedded & SHA-256 Verified
IMG_4516Proposed Basement Equipment Locations (AH-M-1 Relocation)
100%Full Photo
IMG_4516 — Proposed Basement Equipment Locations (AH-M-1 Relocation)
Selected Contractor Sketch Photo

Documents/IMG_4516.jpeg

Owner-directed R67 relocation of AH-M-1 (5 tons) to the basement storage closet immediately left of the lower utility room, plus 2.5-ton AH-B-1 and vertical supply riser RTE-M-TRUNK-01.

Contractor Original:3,792,963 bytes
SHA256: 9580832547e05ee6a5a9be0a43cfaa37f9439fff930fabda3217b9d503e91b53
Derived Review JPG:781,339 bytes
SHA256: cd1be015f82baed6d8d58663045bee52e5e24f80f58c529ec911c0ee498e4c5f
IFC4 Objects Traced From IMG_4516 (4)Click to locate in 3D
Open Full-Resolution IMG_4516.jpeg
BIM Revision R67 — Changes Needing Particular Attention
  • 1. AH-M-1 (5-Ton Air Handler) Relocated: Moved by owner direction to the basement storage closet immediately left of the lower utility room.
  • 2. Four Exhaust Locations Added: Previously omitted exhausts added for the main-floor powder room and three upstairs bathrooms.
  • 3. Casita Distribution Confirmed: Three supply outlets and one return in the private Casita are owner-confirmed.
Validated IFC4 Coordination Data · Issue Date: Oct 24, 2026

78 Geometric HVAC Products & Zone Distribution

All 78 IFC4 Shapes & GUIDs Match R67

Breakdown by HVAC System Component (78 Total)

35Supply Outlets
18Route Segments
11Exhaust Points
10Return Air
4HVAC Equipment

Verified Browser Views & Spatial Containment by Zone

44Main Level
13Upstairs East
11Basement / Terrace
10Upstairs West
8Private Casita

Contractor Source Sketches vs. Preliminary Route Studies

Solid cyan routes in the model are traced from the contractor sketches below. Dashed routes and open-square endpoints are preliminary studies, not confirmed installation paths or outlets.

Original SketchDerived Review ImageZone & Tonnage Coverage
Documents/IMG_4512.jpegDocuments/Review_4512.jpgUpper west, 1.5-ton system distribution
Documents/IMG_4513.jpegDocuments/Review_4513.jpgUpper east / Casita, 2-ton system distribution
Documents/IMG_4514.jpegDocuments/Review_4514.jpgBasement / terrace distribution layout
Documents/IMG_4515.jpegDocuments/Review_4515.jpgMain-floor supply, return & exhaust locations
Documents/IMG_4516.jpegDocuments/Review_4516.jpgProposed basement equipment locations (AH-M-1)

Project Scope & Technical Details

Issue Date: October 24, 2026 · Basis: BIM Revision R67 · Schema: IFC4 (78 HVAC-only geometric products; all source GUIDs and property sets preserved). CHANGES NEEDING PARTICULAR ATTENTION: • AH-M-1 (5 tons): Moved by owner direction to the basement storage closet immediately left of the lower utility room. • Exhaust Additions (4 locations): Four previously omitted exhaust locations were added—Main-floor powder room and three upstairs bathrooms. • Casita Confirmation: Three supplies and one return in the Casita are owner-confirmed. MODEL & ZONE BREAKDOWN (78 Total Objects): • By System Type: 35 Supply · 10 Return · 4 Equipment · 11 Exhaust · 18 Route • By Building Zone: Main Floor (44) · Upstairs East (13) · Basement (11) · Upstairs West (10) · Casita (8) SOURCE DOCUMENTS TO VERIFY AGAINST CONTRACTOR SKETCHES: • Documents/IMG_4512.jpeg — Upper west, 1.5-ton • Documents/IMG_4513.jpeg — Upper east / Casita, 2-ton • Documents/IMG_4514.jpeg — Basement distribution • Documents/IMG_4515.jpeg — Main-floor locations • Documents/IMG_4516.jpeg — Proposed basement equipment locations DRAWING EVIDENCE VS. PRELIMINARY STUDIES: Solid cyan routes are traced from the contractor's sketches. Dashed routes and open-square endpoints are preliminary studies, not confirmed installation paths or outlets. Equipment dimensions, mounting heights, airflow, duct sizing, transitions, and clearances require field and subcontractor verification. Optional gray floor outlines in the viewer are context only; the IFC4 model contains only HVAC geometry. This review package is for coordination review and does not establish construction approval.

Mandatory BIM & Field Coordination Checklist

  • Verify AH-M-1 (5-ton air handler) relocation to the basement storage closet immediately left of the lower utility room, including clearances, return plenum, and condensate routing.
  • Confirm duct routing, fan sizing, and exterior termination paths for the 4 newly added exhaust locations (main-level powder room + 3 upstairs bathrooms).
  • Verify the owner-confirmed Casita HVAC layout (3 supply outlets and 1 return) and 2-ton Upper East / Casita zoning coverage (IMG_4513).
  • Cross-check all 5 contractor source sketches (IMG_4512 through IMG_4516) against the 78 IFC4 objects; distinguish solid cyan sketch-traced routes from dashed preliminary route studies.
  • Verify equipment dimensions, mounting heights, CFM airflow, duct sizing, transitions, and structural clearances across Main (44), Basement (11), Upstairs West (10), Upstairs East (13), and Casita (8) zones.
  • Return findings by exporting review JSON from HVAC_Viewer.html, completing Contractor_Review_Form.csv, or uploading marked-up plans / revised IFC referencing item ID and GUID in the response form.
Subcontractor Sign-Off & Bid Portal

Confirm Plan Review or Submit Trade Bid

Acknowledge review of the Basis: BIM Revision R67 · IFC4 Schema (78 HVAC Objects) or submit your trade proposal and coordination notes.