Electrical & MEP Riser BIM Coordination Package

Austell Commercial & Structural Renovation · Cobb County, GA

Model / Drawing RevisionRev 1.0 — 90% CD Coordination Set
Review / Bid Due Date2026-11-22
Preconstruction ContactDucere Preconstruction Team

Project Scope & Technical Details

Division 26 electrical distribution, panelboard schedules, lighting control integration, and dedicated mechanical/HVAC equipment power feeds coordinated with the project BIM model.

Mandatory BIM & Field Coordination Checklist

  • Confirm main switchgear, subpanel clearances, and conduit routing in the federated MEP model.
  • Verify rough-in box depths and driver enclosure locations for architectural lighting control loads.
  • Coordinate dedicated mechanical equipment circuits with the Division 23 HVAC equipment schedule.
Subcontractor Sign-Off & Bid Portal

Confirm Plan Review or Submit Trade Bid

Acknowledge review of the Rev 1.0 — 90% CD Coordination Set or submit your trade proposal and coordination notes.