Division 22 — PlumbingOpen for Review
Plumbing & Structural Sleeve BIM Coordination Package
Custom Estate Residence — Envelope & MEP Package · Atlanta Metro, GA
Model / Drawing RevisionRev 1.2 — Permit & Coordination Set
Review / Bid Due Date2026-11-30
Preconstruction ContactDucere Preconstruction Team
Project Scope & Technical Details
Division 22 domestic water supply, DWV isometric layout, structural sleeve coordination, and high-efficiency water heating systems.
Mandatory BIM & Field Coordination Checklist
- Review slab-on-grade and structural beam penetrations with structural framing plans before sleeve layout.
- Verify domestic hot water recirculation loop routing and condensate drainage tie-ins with HVAC mechanical plans.